Running a better workshop

Lean and constraint theory, applied to a workshop floor. Short reads, with the diagrams that make the argument.

Bay 1 Bay 2 — slowest Bay 3 20 min 55 min 20 min Work arrives faster than Bay 2 clears it. Speeding up Bay 1 or 3 changes nothing.
Theory of constraints

Find the constraint, or improve nothing

An hour saved anywhere except the bottleneck is an illusion. Goldratt’s five focusing steps, on a workshop floor.

4 min read
One service, booked Monday, out Wednesday book waiting diagnose parts on order repair 4 h touched · 68 h untouched
Value stream mapping

Map one job, end to end

A value stream map of a single service usually finds four hours of work inside a three-day turnaround.

4 min read
12 jobs open 9 days to finish one 5 jobs open 4 days to finish one
Little's Law

Take fewer jobs and finish more

Little’s Law says lead time is work in progress divided by throughput. Workshops rediscover this the hard way.

3 min read
The first four are a weekend. The fifth is forever. Sort Set Shine Standard Sustain Shops stop at four and drift back within a month.
Workplace organisation

5S on the floor, without the posters

Sort, set in order, shine, standardise, sustain. The fifth is the one that fails, and it fails for a reason.

4 min read
Fetched from stores Stocked at the bay 1.8 km a shift 0.4 km a shift
Layout and motion

The walking you cannot see

A technician walks several kilometres a shift without leaving the building. Layout decides how much of it is work.

4 min read
Objective this quarter Cut average turnaround to 2 days Raise first-time fix to 90% Clear 95% of invoices in 30 days
Goal setting

OKRs for a workshop that has never used them

Three key results, one objective, one quarter. The discipline is in what you refuse to measure.

4 min read