Map one job, end to end

A value stream map of a single service usually finds four hours of work inside a three-day turnaround.

One service, booked Monday, out Wednesday book waiting diagnose parts on order repair 4 h touched ยท 68 h untouched

Value stream mapping came out of Toyota and was set down for the rest of us by Womack and Jones in Lean Thinking. The method is simple: follow one unit of work from start to finish and mark every step as either adding value the customer would pay for, or not.

Do it for one car. Not a typical car โ€” an actual one, last week, with real times.

What the map usually shows

A routine service with a brake job attached might look like this: booked Monday, dropped Tuesday 8am, inspected 9am, quote sent 9.40am, approved 2pm, parts ordered 2.10pm, parts arrive Wednesday 11am, work done Wednesday 11amโ€“2pm, invoiced Wednesday 4pm, collected Thursday 9am.

That is a 49-hour turnaround containing about four hours of value-adding work. The customer experienced three days. The shop experienced an afternoon. Everything between is waiting, and waiting is where both margin and goodwill are lost.

The two gaps worth attacking

Inspection to approval โ€” four hours and twenty minutes. The quote went out at 9.40am and was approved at 2pm. Almost always this is a phone call that was not answered. Sending photographs that a customer can look at and approve from their phone typically turns this into minutes, and it is the cheapest change on the map.

Approval to parts โ€” twenty-one hours. The order went in at 2.10pm, after the supplier's afternoon run. One decision โ€” order the likely parts at inspection rather than at approval โ€” can remove most of a day, at the cost of occasionally returning a part.

Why mapping beats guessing

Everyone in the shop has a theory about what slows jobs down, and the theories conflict because each person sees their own segment. A map is a single artefact everyone can look at, and the long bars are not debatable.

Map three jobs and the same two gaps will show up in all three. Those are your process, not your bad luck.

49 hours from drop-off to collection21h17h adding value โ€” 4.2h waiting โ€” 42.3h

What this takes to measure

CapabilityFromWhy
Digital vehicle inspectionsStarterPhotographs out while the customer is still holding their phone.
Time logsStarterReal timestamps, so the map is measured rather than recalled.
Purchase orders and goods receivingProfessionalWhen the part was ordered, and when it actually landed.
Workshop reportsProfessionalThe same map across many jobs, instead of three by hand.

Further reading

  • James Womack & Daniel Jones โ€” Lean Thinking (1996) โ€” value stream mapping.
  • Mike Rother & John Shook โ€” Learning to See (1999) โ€” how to draw one.