Tachyon ๐ŸŒ Global

Running a better workshop

OKRs for a workshop that has never used them

Three key results, one objective, one quarter. The discipline is in what you refuse to measure.

Objective this quarter Cut average turnaround to 2 days Raise first-time fix to 90% Clear 95% of invoices in 30 days

Objectives and Key Results came out of Intel under Andy Grove and reached everyone else through John Doerr. The structure is deliberately small: one objective in plain language, and three key results that are numbers.

Most workshops run on a single implicit objective โ€” do more cars than last month โ€” which is not an objective, it is a hope with a number attached.

What an objective sounds like

It should be a sentence the whole floor would recognise as worth doing. Cars go out faster than they come in. Every job pays for itself. Nobody waits on us. No percentages, no jargon.

What key results sound like

Numbers with a start, a target and a date. Take the first objective:

  • Median turnaround from drop-off to collection, 2.4 days โ†’ 1.5 days.
  • Time from inspection sent to approval received, 4h 20m โ†’ under 45 minutes.
  • Open jobs at 5pm held at or below 12, every day for eight weeks.

Note that all three are outcomes. The most common failure is writing activities instead: "roll out digital inspections" is a task, not a key result. The key result is what changes because you rolled it out. If you complete every task and the number does not move, the tasks were wrong โ€” and an activity-shaped OKR hides exactly that.

The three rules that make it work

One objective per quarter. Three objectives is zero objectives. A shop of six people can hold one thing in its head.

Key results you can already measure. If the baseline requires a month of new record-keeping, pick a different key result this quarter and instrument that one for next. An unmeasurable target is abandoned by week three.

Grade it, and keep the grade. At the end of the quarter, score each key result between 0 and 1. Around 0.7 is healthy โ€” consistently scoring 1.0 means the targets were safe. The grade is information, not a performance review, and the moment it is used as one, people will set targets they know they can hit.

Why this follows the other four

Constraint analysis, a value stream map, a WIP limit and a tidy bay all tell you what to change. OKRs are how a change survives contact with a busy Tuesday. Without them improvement is a mood, and moods do not last a quarter.

Cars go out faster than they come in OBJECTIVE Turnaround 2.4 โ†’ 1.5 days Approval 4h20 โ†’ under 45 min Open jobs held at 12 or fewer Grade each 0โ€“1 at quarter end. About 0.7 is healthy.

What this takes to measure

CapabilityFromWhy
Workshop reportsProfessionalTurnaround, throughput and approval time as measured baselines.
Time logsStarterThe raw data the key results are computed from.
Performance analyticsBusinessThe same figures tracked across a quarter rather than recalculated by hand.
DashboardSoloThe two or three numbers visible without anyone running a report.

Further reading

  • Andrew Grove โ€” High Output Management (1983) โ€” the original formulation.
  • John Doerr โ€” Measure What Matters (2018).